CN / EN
service items
Contact Us
Shuyang Chengji Industrial Co.,Ltd
Add:Shenwei Industrial park, Zhaxia town,Shuyang county,Jiangsu province,China

International Department:
Mr.George Lee, Tel/WhatsApp:+86-18552725520
Email:zongji1989@gmail
Blog

Process flow of tube particle board

Log → chipping → conveying → wood chip storage → shavings → drying → grinding → shavings screening → shavings storage → sizing and waxing → uniform feeding → continuous punching → cross-cut sawing → finished product inspection and storage.

 
①Material preparation section: the logs transported to the factory are peeled and processed into qualified craft wood chips, and sent to the wood chip silo for storage.
 
② Drying section: Dry the wood shavings to a final moisture content of about 2% to 3%.
 
③Screening section: screening the shavings, and the qualified shavings are sent to the hollow particleboard forming line.
 
④Gluing supply section: uniformly sizing the shavings.
 
⑤Forming section: Qualified shavings are steadily and continuously fed into the hollow particleboard forming machine, and the shavings are produced under the action of the punch to produce qualified hollow particleboard.
 
⑥Completion section: The hollow particleboard produced is cut into standard size by a sawing machine.

Previous:last_page

Next:How to operate hot-press ?

HomeAbout UsMulti Rip SawBoard MachineNewsHonorContact Us

Copyright: Shuyang Chengji Industrial Co.,Ltd.
Support by:Baide Network, No.: 苏ICP备12049545